G703-1992

Continuation Sheet

$49.99 - 50-pack or Continuous Ream

G703-1992, Continuation Sheet, breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. (Note: The AIA does not publish a standard schedule of values form.)

Cart

0 items in cart
Total:
$0.00