G704DB-2004
G704DB-2004, Acknowledgement of Substantial Completion of a Design-Build Project
$99.99 - 50-pack
Because of the nature of design-build contracting, the project owner assumes many of the construction contract administration duties performed by the architect in a traditional project. Because there is not an architect to certify substantial completion, A141-2004 requires the owner to inspect the project to determine whether the work is substantially complete in accordance with the design-build documents and to acknowledge the date when it occurs. G704DB-2004 is a variation of G704-2000 and provides a standard form for the owner to acknowledge the date of substantial completion.