G714CMa-1992

G714CMa-1992, Construction Change Directive, Construction Manager-Adviser Edition

$49.99 - 50-pack

G714CMa is designed to effect the same type of substantive changes in the work described in the synopses of G714. The difference between the two lies not in purpose, but in execution: whereas the owner and architect must both sign the G714 in order for the directive to become a valid contractual instrument, G714CMa requires execution by the owner, architect and construction manager-adviser.

Cart

0 items in cart
Total:
$0.00