G714CMa-1992

G714CMa-1992, Construction Change Directive, Construction Manager-Adviser Edition
DO NOT PLACE ONLINE ORDER WITHOUT CALLING FIRST 713-520-0155
WE DO NOT HAVE ALL THE CONTRACTS IN STOCK AND MAY NEED TO ORDER FROM SUPPLIER.

$99.99 - 50-pack

G714CMa is designed to effect the same type of substantive changes in the work described in the synopses of G714. The difference between the two lies not in purpose, but in execution: whereas the owner and architect must both sign the G714 in order for the directive to become a valid contractual instrument, G714CMa requires execution by the owner, architect and construction manager-adviser.

Cart

0 items in cart
Total:
$0.00